CECS
Concrete Tank Inspections
Inspections Required by States
Rehabilitation & Concrete Repair
Retrofitting & Modifications
New Tank Design & Construction
Contact Us
CECS Home Page

Hot Water Tank


Hot Water Tank CECS (Crom Engineering and Construction Services, Inc.) specializes in Hot Water Tank and concrete tank inspections, modifications, rehabilitations, and repair of water and wastewater concrete structures. Our experience in engineering design and construction of water holding structures assures cost effective rehabilitation or retrofitting of existing cast-in-place concrete tanks, post-tension structures or prestressed concrete tanks. CECS provides complete service including assistance in developing specifications and sealed engineering drawings. Our area of operation includes Hot Water Tank in the 10 Southeastern States and the Caribbean.

 

   Site created by Big Media Studios®
Copyright © 2009 by CECS, a subsidiary of The CROM Corporation   
site map      external resources